Products Description
Welcome to the SCYUNCHENG Technical Support page. Below you will find the complete wiring diagram, pinout definitions, and installation instructions for the MP48 OBD II CNG/LPG Sequential Electronic Control Unit (ECU) designed for 4-cylinder and multi-cylinder bi-fuel vehicles.
1. Overview of MP48 CNG/LPG ECU System
The MP48 sequential injection ECU is engineered for modern petrol engines converted to Compressed Natural Gas (CNG) or Liquefied Petroleum Gas (LPG). Featuring a high-speed 32-bit processor, it communicates seamlessly with the vehicle's OBD system to ensure precise fuel-air ratio adjustment, smooth transitions, and compliance with Euro 5 standards.
2. MP48 ECU Pinout and Wiring Instructions
Proper wiring is critical for stable communication between the gas ECU, petrol injectors, MAP sensor, and change-over switch. Refer to the standard pin connections below:
Power Supply (Pins 1 & 2): Connected to the vehicle battery and ignition switch (12V fused).
Gas Injectors (Pins 3 to 6): Connect respectively to the 2Ω/3Ω CNG/LPG injector rails.
MAP Sensor & Temperature Sensor: Linked to measure intake manifold absolute pressure and gas temperature.
Change-over Switch: 4-pin harness connecting the dashboard gas/petrol mode selector switch with a built-in buzzer.
Oxygen Sensor & OBD Communication: CAN High / CAN Low or K-Line wires for real-time fuel trimming.
3. Download Technical Resources
To ensure a safe and professional installation, download the official documentation package below:
📄 MP48 ECU Complete Wiring Diagram (PDF)
Need Expert Technical Support?
If you are facing configuration errors, calibration issues, or require custom wiring harness solutions for specific vehicle models, contact our engineering team directly via WhatsApp: +86 186 2808 8808 or email us at sales@scyuncheng.com.



